All fields in this section are required.
Please provide as much information about your project as you can.
1. What are the dimensions of the dredging or pump-out area(s)?
length x
width x
depth
feet or meters
2. What amount of material needs to be removed?
3. How deep is the material that needs to be dredged?
4. How deep is the water on top of the material?
5. Please describe the type of material to be dredged:
6. Is the material compacted in any way?
Yes No
7. What is the percent of solids in the material in situ?
% by volume
8. What is the specific gravity of the material?
9a. Do you have any experience pumping this material?
Yes No
9b. What is the viscosity?
10a. Is the material Abe anent temp?
Yes No
10b. Temperature range:
11. Does the material tend to emulsify?
Yes No
12a. Is the material caustic, acidic, corrosive, or hazardous in any way?
Yes No
12b. If Yes, please provide pH:
12c. If Yes, please provide chemical composition:
13. Is the material abrasive?
Yes No
14. Are there any obstructions in the lagoon/pond?
Yes No
15a. Is there any debris in the lagoon/pond such as rocks, branches, metal scraps, etc.?
Yes No
15b. If Yes, approximate size and quantity:
16a. Is there any aquatic growth in the lagoon/pond?
Yes No
16b. If Yes,please describe:
17a. Does the lagoon have a liner?
Yes No
17b. If Yes, what type:
18. Describe any special safety precautions required at your site (i.e., fire retardant clothing, chemical resistant equipment, etc.):
19. What is the maximum distance from dredge to Geotube® containers?
feet or meters
20. What is the maximum distance of floating line required?
feet or
meters
21. What is the maximum distance of floating line required?
feet or
meters
22. What is the desired pump feed pipe size?
23. What size of solids are present?
Typical:
Maximum:
Distribution:
24. What is the desired hourly production rate?
cubic yards removed or gallons
25. What utilities are available on-site (electric 480 Volts 3 Phase) & (water)?
Amps:
GPM:
26a. Has this material been dewatered before?
Yes
No
26b. If Yes:
Technology:
Date Completed:
27a. Is polymer being used on site now ?
Yes
No
27b. If so, who is the vendor?
28. Is the application fresh water, brackish water or salt water?
Water Type or Conductivity:
29. What is the hours of operation daily ?
Hours Daily:
Days Weekly:
30. What is the area available for Geotube® containers lay down area?
Length:
Width:
31. When do you need this information?
Please have a salesman call me
For a purchase decision in
months
For a project I'm bidding on - Date
For a project I'm specifying - Date
For my files
32. Discharge water treatment needs can only be accessed by a MPS lab study. The following sludge sample must be provided for testing if this evaluation is required.
RDT Testing (Gallons):
P-GDT Testing (Gallons):